2021

KCP works closely with EWMD on the PVRWRF Tertiary Effluent Pump Station

KCP wraps up the Colorado River Aqueduct Project

2020

KCP lands the Colorado River Aqueduct Project

2019   

KCP lands Perris 2 desalination project EMWD

Builds water lift station panel for EMWD Winchester pond and River Road Lift

2018

Design and builds pump control for San Diego’s Metro System

Builds SCADA system for city of San Juan Capistrano

KCP lands contract for city of San Diego 69th mohawk dump station

2017

KCP moves into a new building in Murrieta, CA

Designs and builds 45 control panels for FedEx and distributed to facilities in Fontana, CA

Builds (3) VFD system panel for SMWD secondary effluent pumps

2016 - 2012

Designs and builds 12 control system VFD panels for Orange County Central Plant

Designs, builds and installs PLC control system for Escondido Sand & Gravel Asphalt machine

2011 - 2006

KCP moves to Aguanga, CA and re-organizes the corporation

Designs and UL certifies battery storage system controls for BYD, US department of energy and UCSD

Builds 14 Control System for HAAKON Air handlers at UCSD

2005 - 2004

KCP moves from Lake Elsinore to Murrieta

Builds dump and air handler package control for AMGEN corporation

2003

KCP lands national contract for CKE hood, fan and control packages

Designs and builds PLC bases lighting control package for Kmart international corporation nationally

2002

Designs portable Waste Water Treatment Plant for Rocky Mountain pure water systems

Design, test and certify custom hood ventilation system for Char Broiler for CKE

2001

Designs PLC control systems for control room for city of Glendale Arizona (3.5 Million Gallon Per Day Waste Water Treatment Plant)

Design and build MCC cabinets for city of El Mirage in Arizona (Waste Water Treatment Plant)

2000

KCP moves into new building in Lake Elsinore, CA

Designs and builds programs pure water and waste water treatment PLC, VFD pump control systems for city of the year award

CKE presents KCP with vendor of the year award

1999

The building in Lake Elsinore breaks ground

KCP lands contract to supply and install Exhaust Hood Ventilation Systems for IN-N-OUT Burger

Starts working on pure water and wastewater transmission all design control for P.A.C.E. Barona casino

Designs and builds cooling control system for World Com Corp Data Centers in Boston, New York, Chicago and LA

1998

Designs and build Control and Fan Package for CKE (Carl’s Jr)

KCP lands contract to build Tank Heater Control Panels for Pennsylvania Base Waste Water Submersion Heater Manufacture

KCP signs contract to build 12500 square foot facility from the ground up

1997   

Expands product offering to the Chrome cooling plant facility air exhaust system with MAPCO

Designs lake and feature fountain control systems for pacific Aquascape, employing VFD technology in water pumping applications

KCP lands national private label contract with Griswold controls for Sand filtration and separator systems

1996

Cooling tower business with Evapco goes national

KCP published white paper about the energy solving benefit of using VFDs the run cooling tower FPN motors

KCP installs first ever VFD on cooling tower in San Francisco

Delfield Corp Name KCP as vendor of the year

1995

Opens complete sheet metal fabrication facility to manufacture kitchen ventilation equipment

KCP lands national contract with McDonalds and Walmart to design and build UL listed controls for McDonald’s stores inside Walmart’s

Expands product line to kitchen vent hoods and private labels for Airtech / Halton corporation

1994

Expands product line to include UL listed and AMCA certified kitchen grease extractor and fresh air supply fan system

KCP lands national contract with Kmart corporation to supply kitchen ventilation equipment

Expands into a bigger facility in Yorba Linda, CA

1993

KCP starts building controls for EVAPCO Cooling Tower corporation

Designs the first ever UL listed 2 speed 1 winding cost effect and safe cooling tower control system.

Designs and builds controls for the Penske Auto Center nationally

Expands operations to new and larger facility in Yorba Linda, CA

1992

KCP became Vendor of the year for Kmart corporation and the first ever sole supplier to Kmart international corporation.

Became Kmart’s control design engineering consultants

Landed UL Control Panel private label Deal with Delfield corporation

KCP Industries becomes a California Corporation

1991

KCP lands international contract to supply UL listed control panels for Kmart corporation, and Little Caesars Pizza stations

Opens first manufacturing facility in Yorba Linda, CA

1990

KCP is founded by Karen and Paul Poltun

Develops the best exhaust emissions, smoke, and odor control systems technology for South Coast Quality Management District restaurants