Company Timeline
2021
KCP works closely with EWMD on the PVRWRF Tertiary Effluent Pump Station
KCP wraps up the Colorado River Aqueduct Project
2020
KCP lands the Colorado River Aqueduct Project
2019
KCP lands Perris 2 desalination project EMWD
Builds water lift station panel for EMWD Winchester pond and River Road Lift
2018
Design and builds pump control for San Diego’s Metro System
Builds SCADA system for city of San Juan Capistrano
KCP lands contract for city of San Diego 69th mohawk dump station
2017
KCP moves into a new building in Murrieta, CA
Designs and builds 45 control panels for FedEx and distributed to facilities in Fontana, CA
Builds (3) VFD system panel for SMWD secondary effluent pumps
2016 - 2012
Designs and builds 12 control system VFD panels for Orange County Central Plant
Designs, builds and installs PLC control system for Escondido Sand & Gravel Asphalt machine
2011 - 2006
KCP moves to Aguanga, CA and re-organizes the corporation
Designs and UL certifies battery storage system controls for BYD, US department of energy and UCSD
Builds 14 Control System for HAAKON Air handlers at UCSD
2005 - 2004
KCP moves from Lake Elsinore to Murrieta
Builds dump and air handler package control for AMGEN corporation
2003
KCP lands national contract for CKE hood, fan and control packages
Designs and builds PLC bases lighting control package for Kmart international corporation nationally
2002
Designs portable Waste Water Treatment Plant for Rocky Mountain pure water systems
Design, test and certify custom hood ventilation system for Char Broiler for CKE
2001
Designs PLC control systems for control room for city of Glendale Arizona (3.5 Million Gallon Per Day Waste Water Treatment Plant)
Design and build MCC cabinets for city of El Mirage in Arizona (Waste Water Treatment Plant)
2000
KCP moves into new building in Lake Elsinore, CA
Designs and builds programs pure water and waste water treatment PLC, VFD pump control systems for city of the year award
CKE presents KCP with vendor of the year award
1999
The building in Lake Elsinore breaks ground
KCP lands contract to supply and install Exhaust Hood Ventilation Systems for IN-N-OUT Burger
Starts working on pure water and wastewater transmission all design control for P.A.C.E. Barona casino
Designs and builds cooling control system for World Com Corp Data Centers in Boston, New York, Chicago and LA
1998
Designs and build Control and Fan Package for CKE (Carl’s Jr)
KCP lands contract to build Tank Heater Control Panels for Pennsylvania Base Waste Water Submersion Heater Manufacture
KCP signs contract to build 12500 square foot facility from the ground up
1997
Expands product offering to the Chrome cooling plant facility air exhaust system with MAPCO
Designs lake and feature fountain control systems for pacific Aquascape, employing VFD technology in water pumping applications
KCP lands national private label contract with Griswold controls for Sand filtration and separator systems
1996
Cooling tower business with Evapco goes national
KCP published white paper about the energy solving benefit of using VFDs the run cooling tower FPN motors
KCP installs first ever VFD on cooling tower in San Francisco
Delfield Corp Name KCP as vendor of the year
1995
Opens complete sheet metal fabrication facility to manufacture kitchen ventilation equipment
KCP lands national contract with McDonalds and Walmart to design and build UL listed controls for McDonald’s stores inside Walmart’s
Expands product line to kitchen vent hoods and private labels for Airtech / Halton corporation
1994
Expands product line to include UL listed and AMCA certified kitchen grease extractor and fresh air supply fan system
KCP lands national contract with Kmart corporation to supply kitchen ventilation equipment
Expands into a bigger facility in Yorba Linda, CA
1993
KCP starts building controls for EVAPCO Cooling Tower corporation
Designs the first ever UL listed 2 speed 1 winding cost effect and safe cooling tower control system.
Designs and builds controls for the Penske Auto Center nationally
Expands operations to new and larger facility in Yorba Linda, CA
1992
KCP became Vendor of the year for Kmart corporation and the first ever sole supplier to Kmart international corporation.
Became Kmart’s control design engineering consultants
Landed UL Control Panel private label Deal with Delfield corporation
KCP Industries becomes a California Corporation
1991
KCP lands international contract to supply UL listed control panels for Kmart corporation, and Little Caesars Pizza stations
Opens first manufacturing facility in Yorba Linda, CA
1990
KCP is founded by Karen and Paul Poltun
Develops the best exhaust emissions, smoke, and odor control systems technology for South Coast Quality Management District restaurants